Purpose

I will try my best to provide detailed info on various cars and what is like to live with them, I have already produced a few for Jaguar-car-forums, I will do my best to be unbiased, but it will be hard for some cars. I will re-produce press releases and copy from other motoring news.
Showing posts with label 1400 jobs. Show all posts
Showing posts with label 1400 jobs. Show all posts

Friday, 31 October 2014

JLR opens new engine plant in Wolverhampton UK, now the expansions can begin.

  • Britain’s leading premium automotive manufacturer officially opens the doors to its new world-class Engine Manufacturing Centre.
  • Jaguar Land Rover brings engine manufacturing in-house for the first time in a generation.
  • The new £500m Engine Manufacturing Centre cements Jaguar Land Rover’s position as the UK’s leading automotive investor.
  • Facility supports regional regeneration with 1,400 jobs created.
Jaguar Land Rover today marked a seminal moment in its history with the official opening of its new Engine Manufacturing Centre. The £500m facility, announced in September 2011, represents a significant step in Jaguar Land Rover’s strategic investment programme and will see engines being produced in-house for the first time in a generation.
Located near Wolverhampton in the West Midlands, the Engine Manufacturing Centre is home to the Ingenium engine family which will power a new generation of Jaguar Land Rover products designed, engineered and manufactured in the UK. This starts with the 2.0-litre diesel, which rolls off the production line early next year, destined for the new Jaguar XE.
Commenting on the opening Dr. Ralf Speth said: “The Engine Manufacturing Centre represents all that is great about British engineering.
Jaguar Land Rover is a business driven by design, technology and innovation and this investment and level of job creation is yet further evidence of our commitment to advancing the capability of the UK automotive sector and its supply chain."

With a vision to set a new global benchmark for excellence in engine manufacturing, Jaguar Land Rover is drawing on the expertise of 2,000 powertrain engineers who have been inspired by the company’s 70-year heritage in the design and development of iconic engines. These engineers, together with the new 1,400 strong team at the Engine Manufacturing Centre, will deliver the next generation of highly efficient, ultra-low emission 4-cylinder petrol and diesel engines.
Jaguar Land Rover broke ground on the i54 Business Park site in June 2012. Today, the 100,000 square metre, state-of-the-art facility, houses an engine-testing centre alongside manufacturing and assembly halls, and meets the highest standards of sustainable production.
Awarded a rating of ‘excellent’ by BREEAM, for sustainable buildings, the facility is home to the largest rooftop solar panel installation in the UK, comprising no fewer than 21,000 individual panels. It is estimated that these panels will generate more than 30% of the plant’s energy requirements - providing the same amount of energy required to power 1,600 homes.
Commenting on the importance of the Engine Manufacturing Centre, Trevor Leeks, Operations Director at the site said: “I am proud to be leading the world-class team who will bring years of hard work to fruition as we execute the flawless launch of Jaguar Land Rover’s first in-house engines in a generation.
“Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment.”

Thursday, 30 October 2014

Inside Jaguar Land Rovers new Engine Facility in Wolverhampton.

The opening of the state-of-the-art Engine Manufacturing Centre is a seminal moment for Jaguar Land Rover as it embarks on manufacturing engines in-house for the first time in a generation, confirming its position as the UK’s most significant automotive investor.
The Engine Manufacturing Centre will be home to the ‘Ingenium’ engine family, which will power a new generation of Jaguar Land Rover products designed, engineered and manufactured in the UK. This starts with the 2.0-litre diesel engine in the Jaguar XE. Jaguar Land Rover is transforming its business and brands through a programme of sustainable, strategic investments.
This £500 million facility is the latest demonstration of the company’s commitment to supporting the UK’s burgeoning manufacturing industry. When operating at full capacity, the Engine Manufacturing Centre will employ 1,400 people with a further 5,500 jobs created in the supply chain, where production of these engines will help provide a critical mass for inward investment.

At the heart of the Engine Manufacturing Centre is a team of people committed to setting a new global benchmark in the way engines are manufactured. Through an unrelenting commitment to training, Jaguar Land Rover is developing the skills required to future-proof its engineering capability and provide a sustainable foundation for continued business growth.
Welcome to the future of engine manufacturing in Britain.
THE HALLMARKS OF APPROVAL - THREE ROYAL WARRANTS
“Our Royal Warrants contribute to Jaguar Land Rover’s accelerating global growth, helping us to take exciting British design and advanced British engineering around the world.”
Dr Ralf Speth, Chief Executive Officer, Jaguar Land Rover
Jaguar Land Rover is extremely proud to welcome Her Majesty The Queen and His Royal Highness The Duke of Edinburgh to the all-new Engine Manufacturing Centre. The company holds the Royal Warrant as “Manufacturers of Motor Vehicles, By Appointment” from all three current grantors: HM The Queen, HRH The Duke of Edinburgh and HRH The Prince of Wales.
Jaguar Land Rover is the only automotive manufacturer granted all three Royal Warrants. For nearly 900 years the Royal Warrant has been one of the proudest acknowledgements of quality around the world. It is granted to represent not only simple excellence of product or service, but also the personal preferences of the Royal grantors. A fleet of 10 Land Rovers, each bearing the Royal Crest and the Royal Standard, was used when HM The Queen and HRH The Duke of Edinburgh undertook their 44,000-mile tour of the Commonwealth in 1953/54, soon after the Coronation.
Since then HM The Queen, HRH The Duke of Edinburgh and other members of the Royal Family have regularly used a wide variety of Jaguar Land Rover vehicles.
PRECISE ENGINEERING - THE MACHINING HALL
“Almost half the total investment on the project was made on these machines.”
Paul Blackman, Production Area Manager
This area represents the cutting edge of manufacturing technology, utilising 150 state-of-the-art machines working across three lines. Everything from assembly robots and lasers to drilling and high-pressure wash machines operate here, representing an investment of more than £150 million.
The first line is where the aluminium block begins its transformation from a simple chunk of metal to the technologically advanced heart of the Ingenium engine. It is heated in an oven before undergoing a series of machining operations, always punctuated by high-pressure washes to filter debris away. The second line contains the cylinder head, which undergoes a similar process. The crankshaft line differs as it is machining forged steel, not aluminium. Here, the steel is milled, turned and drilled. Both automated and manual tests take place throughout each line, ensuring that each component is made to the highest standard of quality possible.
This area represents the precision of technology, driven by human craftsmanship. It is where the very first parts of the engines are made, containing within them the DNA of Ingenium.
PIECE BY PIECE - THE DIESEL ASSEMBLY HALL
"The assembly line is the birth of the engine.”
John Turner, Assembly Area Manager
This is where approximately 245 separate parts come together to form an engine derivative. It is also where Jaguar Land Rover’s commitment to people is most evident; more than 150 associates currently work here, across a total of 17 zones.
More associates will join the team when the petrol Assembly Hall also becomes operational. The aluminium block, cylinder head and crankshaft move through the zones, each one bolstered by additional components and rigorous testing, before finally joining together.
The engine is then cold tested, an eco-friendly procedure that ensures the highest quality standards are met, before leaving the assembly line.
If the Machining Hall is where the journey of the engine begins, then the Assembly Hall is where it is given life, going from a disparate assemblage of components to a finished engine, the first member of the Ingenium family that will power a new generation of Jaguar Land Rover products.
LOGISTICS - EVERYTHING IN ITS PLACE
The logistical challenge that a facility of this scale represents is immense, and the logistical department is every bit as vital to the success of the centre as the manufacturing process itself.
The Engine Manufacturing Centre has 71 suppliers, approximately 30 per cent of which are based in the UK. Hundreds of individual parts will be required when both diesel and petrol divisions are operational. These will be delivered to two main receiving areas – five bays in the Assembly area and two in the Raw Materials area. Once inside the facility, the parts will be transported on specially adapted cargo trains, making 133 movements a day, facilitating a huge volume of engines while never compromising on quality.
This process has an inherent capacity for flexibility, allowing logistical operations to keep up with the rapidly evolving demands of the modern automotive industry.
PUTTING THE FACT IN FACTORY
Top 10 details about the Engine Manufacturing Centre
  • £500 million investment
  • 100,000m2 in size – the equivalent of 14 football pitches
  • 6,500m3 of topsoil excavated from the site
  • 4,400 tonnes of hot-rolled steel used in the construction
  • 32.1 miles of trenching for ducts and drainage
  • 21,000 photovoltaic panels on the roof, providing the same amount of energy required to power 1,600 homes
  • £650,000 – the average cost of one of the high-tech machines in the Machining Hall
  • 0.003 millimetres – the detailing on a crankshaft is polished to be less than the width of a strand of human hair
  • 245 – approximate number of parts in each engine derivative
  • 90 seconds – time taken to perform a cold test on a single engine
ALIVE WITH TECHNOLOGY - INGENIUM
“Customers are increasingly demanding cleaner running, more efficient vehicles that maintain or even enhance performance attributes. Our Ingenium engines deliver this to a new level.”
Dr. Wolfgang Ziebart, Jaguar Land Rover Group Engineering Director
These engines will be Jaguar Land Rover’s most advanced ever. This new family of premium, lightweight, four-cylinder units will utilise the most flexible engine architecture ever produced by Jaguar Land Rover, making them efficient, powerful and capable of producing up to 300Nm of torque while emitting as little as 99g/km of CO2.
The core of Ingenium comprises extremely strong and compact aluminium blocks, which will allow a range of engines to be developed, both quickly and efficiently, to meet the rigorous regulatory and competitive requirements of the future.
All variants will be equipped with high-tech turbochargers that improve performance, and help reduce CO2emissions. Their modular design enables petrol and diesel engines to share many common internal components.
This reduces complexity, raises quality and simplifies manufacturing. Despite adding features and increasing power output, Ingenium engines weigh as much as 80kg less than equivalent engines of today. The Engine Manufacturing Centre will allow Ingenium engines to deliver outstanding low-end torque, effortless acceleration and class-leading emissions performance with low consumption.
Before the first Ingenium engine leaves the factory, it will have already undergone the equivalent of more than eight years of the toughest, most punishing testing that Jaguar Land Rover engineers could devise. These include more than 72,000 hours of dyno testing and 2 million miles of real-world testing.
FAMILY VALUES - NURTURING SKILLS AND EXPERTISE
We will be the benchmark for excellence across the globe, creating a legacy for generations to come through a tenacious approach to continuous improvement. A proud and passionate family who live our values to create a supportive learning environment where there is equality and mutual respect for all.
The Engine Manufacturing Centre Vision
Amongst the first objectives of the Engine Manufacturing Centre operations team was the establishment of a Vision and Values by which its entire workforce would live. These values will ensure that each and every employee plays their part in delivering the flawless standards required to set a new global benchmark for excellence in engine manufacturing.
When at full capacity the engine manufacturing centre family will be 1,400 strong, with each member showcasing world-class skills and expertise in the UK’s automotive heartland, creating a legacy for generations to come. To deliver this, a bespoke two-week training programme called ‘The Powertrain Way’ was developed to teach all employees, from HR consultants to machine operators, the lean engineering principles at the heart of the engine manufacturing operation.
CLEAN AND GREEN - SUSTAINABILITY
To date, more than 20,000 training hours have been completed by 254 associates, driving quality standards forward.
The Engine Manufacturing Centre has been designed with sustainability embedded throughout and has recently been awarded a rating of ‘excellent’ by BREEAM, for sustainable buildings.
The centre has the largest rooftop solar panel installation in the UK, comprising no fewer than 21,000 individual panels. It is estimated that these panels will generate more than 30 per cent of the site’s energy, reducing its CO2 footprint by more than 2,400 tonnes per year.
Debris from the manufacturing process is filtered away and prepared for transport off-site. This is an environmentally friendly process, and the recycled aluminium briquettes created from it bolster the facility with additional revenue.
The production halls are ‘clean room’ environments, ventilated by a positive air system. Energy monitoring facilities in the plant continually analyse the amount of energy being used and identify opportunities to reduce electricity and gas consumption.

Saturday, 15 February 2014

British prime Minister visits JLR's new powertrain plant

Jaguar Land Rover welcomed the Prime Minister David Cameron to its world-class Engine Manufacturing Centre in the West Midlands. The Prime Minister was given a tour of the new plant where he saw the on-going installation of the manufacturing equipment first hand.

Jaguar Land Rover’s state-of-the-art Engine Manufacturing Centre is the first new facility that the company has built from the ground up. Based at the heart of the UK, it is ideally located between the company’s three other manufacturing sites at Halewood, Castle Bromwich and Solihull. Almost 1,400 jobs will be created by the time the plant reaches its full capacity.


Representing an investment of more than £500 million, the plant will manufacture Jaguar Land Rover’s most advanced engines ever. Designed and developed at the company’s Product Development Centre in Whitley, this new family of premium, lightweight, low-friction, low-emission four cylinder petrol and diesel engines will be manufactured for future Jaguar Land Rover vehicles.

The Prime Minister said, “Whenever I come to one of your plants, it makes my spirits soar when I see such an exciting future for British manufacturing. Everywhere I go in the world I support Jaguar Land Rover. This is a great British success story.”
Jaguar Land Rover’s Executive Director, Mike Wright commented, “Our world-class new facility incorporates the latest technologies meeting the highest standards of production and demonstrates our continued commitment to UK manufacturing.
“We are proud to show Prime Minister David Cameron around our plant today as our team begins to commission the equipment which will be used to manufacture our most advanced engines ever.”

The plant boasts almost 100,000 square metres of internal floor area, equivalent to the area of 14 football pitches. It comprises of three manufacturing halls – one for machining the cylinder heads, cylinder blocks and crankshafts, one for assembling diesel engines and one for assembling petrol engines. The first engines will come off the assembly line in early 2015.  

Sunday, 1 September 2013

Ford Fusion continues great sales in the US, where the hell is the European version ?


  • With 1,400 new jobs and a $555 million investment, Flat Rock Assembly Plant begins Ford Fusion production
  • Production added to improve tight availability of Ford Fusion; U.S. Fusion sales up 13 percent this year
  • Ford will hire almost 6,500 workers in the U.S. this year to support new products, growth and investment; company has added more than three-quarters of the 12,000 hourly jobs it committed to add in the U.S. by 2015

Supported by 1,400 new employees, the new Ford Fusion will roll off the line at Flat Rock Assembly Plant today, marking the first time the popular car has been built in the United States.

The move expands Fusion availability by more than 30 percent – up to 350,000 units annually – as the midsize sedan is setting sales records for Ford.

“With its bold design and great fuel economy, Fusion has exceeded all of our expectations, with demand outstripping supply,” said Joe Hinrichs, Ford president of The Americas. “Fusion in Flat Rock is a win for all of our stakeholders – including customers, employees and dealers. At the same time, Ford is continuing its massive investment in America by creating another 1,400 jobs.”

The 1,400 new employees Ford hired to support added production at Flat Rock Assembly Plant puts the company more than 75 percent of the way toward its goal of creating 12,000 hourly jobs in the United States by 2015. In 2013 alone, Ford is hiring nearly 6,500 new hourly and salaried employees in the U.S. to support products, growth and investment.

Strong Fusion sales
Fusion sales – up 13 percent in the U.S. this year – remain very strong. Through July, Ford sold more than 181,000 Fusions, 21,000 more than were sold in the same period last year. Fusion vehicles are selling in fewer than 20 days in such key markets as San Francisco, Los Angeles and Miami, compared with the industry average of approximately 60 days. The high-end Fusion Titanium is turning even faster in these markets – fewer than 15 days on dealer lots.

Demand for Fusion is growing as the sedan continues to win over buyers from other automakers, particularly Asian manufacturers, with a competitive conquest rate of 50 percent.

Fusion has earned accolades from customers and influential publications, winning seven major awards in its first nine months of production.

Featuring a sleek silhouette and fresh face, the new Fusion is the latest in a series of vehicles from Ford – following the 2011 Fiesta subcompact and 2012 Focus small car – developed to serve customers who want leading fuel efficiency, smart technologies and game-changing design.

Fusion is the first sedan to offer gasoline, hybrid and plug-in hybrid powertrains, underscoring Ford’s commitment to give customers the power of choice. Fusion Hybrid is EPA-certified with a best-in-class 47 mpg city, 47 mpg highway and 47 mpg combined fuel economy rating.

Customers can choose from Fusion’s widest-ever portfolio of fuel-efficient powertrains, including EcoBoost® gasoline-powered, hybrid and plug-in hybrid, automatic and manual transmission offerings and Auto Start-Stop technology.

With seven must-have technologies – including a Lane-Keeping System, adaptive cruise control, active park assist and MyFord Touch® – Fusion demonstrates Ford’s commitment to deliver features customers truly want and value in their vehicles.

Flat Rock transformation
“We are thrilled to have added production of Fusion at Flat Rock Assembly Plant – not just for our dedicated workforce here, but for the entire metro Detroit community and the associated jobs it will create,” said UAW Vice President Jimmy Settles. “Together with the domestic automakers and through the collective bargaining process, we are able to bring jobs to the U.S. that were previously located offshore. Fusion production in Flat Rock is a key part of that.”

To prepare Flat Rock’s newest hires to build Fusion, a simulated factory has been introduced to provide hands-on training in a real-world environment. The simulated factory allows workers to master the tasks they may be performing on the line. It also is expected to help reduce employee attrition and improve overall manufacturing and safety.

As part of a $555 million investment, Flat Rock Assembly Plant has added a state-of-the-art, fully flexible body shop to allow multiple models to be produced on the same assembly line, supporting Ford’s flexible manufacturing efforts.

“We have completely transformed Flat Rock Assembly Plant to help prepare for Fusion production. These upgrades have allowed us to ensure we are building the highest-quality cars,” said Tim Young, plant manager, Flat Rock Assembly Plant.

Ford also has upgraded the plant’s paint shop with installation of its three-wet paint process. It is more environmentally friendly and takes less time than conventional paint processes, without compromising vehicle paint quality or durability.

Other technologies incorporated at Flat Rock include laser brazing, a form of welding that will be used on Fusion to attach the roof of the car to the body with a high-quality, aesthetically pleasing seam. In 2014, dirt detection technology will be introduced at Flat Rock to ensure optimal paint and surface quality, leading to smoother, shinier cars.

Flat Rock Assembly Plant also produces the iconic Ford Mustang, now in its 50th year. The plant recently celebrated the 1 millionth Mustang built at the facility. With the addition of Fusion production, Flat Rock Assembly Plant will have approximately 3,000 employees working two shifts at full line speed.

The Flat Rock factory has been producing vehicles since 1987, when it opened as Mazda Motor Manufacturing USA and built the Mazda MX-6. Ford purchased a 50 percent share in the facility in 1992, and it was renamed AutoAlliance International. During the years, the plant has produced the Mazda 626, Mazda6, Mercury Cougar and Ford Probe.

Fusion also is produced at Hermosillo Assembly Plant in Mexico. Chongqing Assembly Plant 1 in China also builds the car, which is known as the Ford Mondeo in other markets globally.